The floor platform (click images for a larger version)

alt

The joists installed.

alt

Rim joists in place.

Gable window, west side

The sheathing is in place but not nailed down yet. A few of the lower cross-braces are also in place. Ignore the woman dancing on the subfloor. She's been out in the sun too long.

alt

All the sheathing is in place and plastic is ready to cover it. We also cleaned up the earth around the cabin for better water drainage and did a final backfill on the footings.

Gable window, west side

Here's a detail shot of the diagonals installed to stiffen the post structure. The four missing diagonals that go from the post base to the rim joist will be installed later to fully strengthen the structure and help protect against wind and earthquake damage. On that topic, we also installed metal post anchors to the tops of the posts, connecting them to the beam in a really solid way.